Projects in operation

Azeri Central East (ACE)

The ACE project is a development which includes a new 48-slot production, drilling and quarters platform located mid-way between the existing Central Azeri and East Azeri platforms in approximately 460 feet of water depth. New infield pipelines transfers oil and gas from the ACE platform to the existing ACG Phase 2 oil and gas export pipelines for transportation to the onshore Sangachal terminal.

Location
Azerbaijan
Operator BP
Partners BP (30.37%), AzACG (25.00%), MOL (9.57%), INPEX (9.31%), Equinor (7.27%), ExxonMobil (6.79%), TPAO (5.73%), ITOCHU (3.65%), ONGC Videsh (2.31%)
Project type Conventional oil
Start-up April 2024
Peak annual average production, gross ~95 mboed 
Peak annual average production, net ~10 mboed 

Projects in construction

2024 and beyond

Argos Southwest Extension

Argos Southwest Extension is a three well subsea tie-back to the Argos facility.

Location
US Gulf of Mexico
Operator BP
Partners BP (60.5%), Woodside Energy (23.9%), Chevron (15.6%)
Project type Deepwater oil
Start-up 2026
Peak annual average production, gross ~20mboed
Peak annual average production, net ~10mboed

Atlantis Drill Center 1 Expansion

Atlantis Drill Center 1 Expansion (DC1X) is a two well subsea tie-back to the existing Atlantis facility.

Location
 US - Gulf of Mexico
Operator  BP
Partners BP (56%), BHP Billiton (44%)
Project type  Deepwater oil
Start-up  2026
Peak annual average production, gross ~15mboed
Peak annual average production, net ~1mboed

Cypre

The Cypre Project is a phased 7 well sub-sea tie back to the Juniper Platform.  

Location
Trinidad
Operator BP
Partners 100% owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG 
Start-up 2025
Peak annual average production, gross ~ 55mboed
Peak annual average production, net ~ 55mboed

GTA Phase 1

GTA Phase 1 is the first phase of the Greater Tortue Ahmeyim project which will produce gas from an ultra-deepwater subsea system and mid-water floating production, storage and offloading (FPSO) vessel. The gas will be transferred to a floating liquefied natural gas (FLNG) facility at an innovative nearshore hub located on the Mauritania and Senegal maritime border. The FLNG facility is designed to provide circa 2.5 million tonnes of LNG per annum of nameplate capacity, with the total gas resources in the field estimated to be around 15 trillion cubic feet.

Location
Mauritania and Senegal
Operator BP
Partners BP (56%), Kosmos (27%), PETROSEN (10%), SMHPM (7%) 
Project type LNG
Start-up 2024
Peak annual average production, gross ~70 mboed
Peak annual average production, net ~35 mboed 

Mento

The Mento Project consists of building an attended wellhead platform with well testing capability which will tie back to the Pelican platform. The project includes 12 development wells, including 3 exploration tails.

Location
Trinidad
Operator EOG
Partners BP (50%), EOG (50%),
Project type LNG
Start-up  2025
Peak annual average production, gross ~50 mboed 
Peak annual average production, net ~25 mboed 

Murlach

Murlach is a high pressure, high temperature development located in the Central North Sea approximately 4 miles from ETAP Central Processing Facility (CPF). Murlach will be tied back to the ETAP CPF partially utilising existing subsea and topside infrastructure. 

Location
North Sea
Operator BP
Partners BP (80%), NEO Energy (20%) 
Project type Conventional oil
Startup 2025
Peak annual average production, gross ~20mboed
Peak annual average production, bet ~15mboed

Raven Infills

The Raven Infills Project is a 2 well fast paced subsea tieback to existing Raven infrastructure. 

Location
Egypt
Operator BP
Partners BP (82.75%), DEA (17.25%)
Project type Gas
Start-up 2025
Peak annual average production, gross ~45mboed
Peak annual average production, net ~35mboed

Projects in design

Browse

Location
Australia
Operator Woodside
Partners Woodside (30.60%), BP (44.33%), Japan Australia LNG (14.40%) and PetroChina (10.67%)
Project type LNG 
Start-up Beyond 2024

Clair Ridge Expansion

Location
North Sea
Operator BP
Partners BP (45.1%), Harbour Energy (7.5%), Chevron (19.4%), Shell (28%)
Project type Conventional Oil
Start-up Beyond 2024

Ginger 

Location
Trinidad
Operator BP
Partners 100% operated by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG
Start-up Beyond 2024

GTA Phase 2

Location
Mauritania and Senegal
Operator BP
Partners BP (56%), Kosmos (27%), PETROSEN (10%*), SMHPM (7%)
Project type LNG
Start-up Beyond 2024

Kaskida

Location
US - Gulf of Mexico
Operator BP
Partners BP (100%)
Project type Deepwater oil
Start-up Beyond 2024

Shah Deniz Compression

Location
Azerbaijan
Operator BP
Partners BP (29.99%), AzSD (14.35%), TPAO (19%), Petronas (15.5%), SGC Upstream (6.67%), Lukoil (19.99%), NICO (10%)
Project type Gas
Start-up Beyond 2024

Tangguh Ubadari Compression and Capture

Location
Indonesia
Operator BP
Partners BP (40.22%) MI Berau B.V. (16.30%), CNOOC Muturi Ltd (13.90%), Nippon Oil Exploration (Berau) Ltd (12.23%), KG Berau Petroleum Ltd (8.60%), KG Wiriagar Overseas Ltd (1.40%), Indonesia Natural Gas Resources Muturi Inc. (7.35%)
Project type LNG
Start-up Beyond 2024